Power shutdown in Kashmir parts

Power shutdown in Kashmir parts

Similarly, to carry out branch cutting the power supply to the areas fed from 33 kV lines of STD Ganderbal shall remain affected.
The power supply to the areas falling under Receiving Stations Power House, Duderhama and Manigam fed from 33 kV Alasteng Power House line shall remain affected on September 5 and 7 from 10 am to 5 pm.
The power supply to the areas falling under Receiving Stations Nagbal, Alasteng, Ganda Singh and Tulbagh fed from 33 kV Alasteng -Nagbal line shall remain affected on September 8 and 10 from 10 am to 5 pm.
The power supply to the areas falling under Receiving Station Wussan fed from 33 kV Kangan-Wussan line shall remain affected on September 5 from 10 am to 5 pm.
The power supply to the areas falling under Receiving Stations Surfraw and Gagangeer fed from 33 kV Kangan -Surfraw line shall remain affected on September 7 and 8 from 10 am to 5 pm.
The power supply to the areas falling under Receiving Station Kangan fed from 33 kV Kangan-Kangan line shall remain affected on September 8 from 10 am to 5 pm.
The power supply to the areas falling under Receiving Station Tulmulla Lar fed from 33 kV Badampora -Duderhama line shall remain affected on September 9 from 10 am to 5 pm.

Leave a Reply

Your email address will not be published.